Virtual grid expansion: sufficient capacity for your electrification plans

Instead of long wait times for a physical grid upgrade, Bnewable expands your grid connection virtually, starting today, so your electrification plans continue as planned.

Two Bnewable colleagues in a meeting room reviewing energy generation and consumption charts in the Voltana dashboard on a wall-mounted screen

Warum Unternehmen ihren Netzanschluss virtuell mit Bnewable erweitern

Sie warten

0 Jahre

auf einen erweiterten Netzanschluss

Sie zahlen

0 Euro

Investition

Wir steuern

24/7

den Speicher, abgestimmt auf Ihren Strombedarf

Sie mieten

100%

flexibel nur die Kapazität, die Sie brauchen

Why companies expand their grid connection virtually with Bnewable

​

0 years

Wait time for an expanded grid connection

​

€0

Investment costs

​

100% flexible

You only rent capacity when you need it

Battery-as-a-Service

Erweiterter Netzanschluss mit Bnewable, ohne lange Jahre Wartezeit

Volle Fahrt für Ihre Elektrifizierungspläne

Ob E-LKW-Flotte oder neuer elektrischer Ofen: Die Elektrifizierung Ihres Unternehmens nimmt Fahrt auf und mit ihr Lastspitzen im Megawattbereich. Dafür müsste Ihr Netzanschluss physisch erweitert werden, auf diese Genehmigung warten Sie derzeit bis zu 10 Jahre. Mit unserem Batteriespeicher erweitern Sie Ihren Netzanschluss einfach virtuell und elektrifizieren damit schon heute.

Extra Kapazität, wenn Sie sie brauchen

Der Batteriespeicher stellt die benötigte Energiekapazität genau dann bereit, wenn Ihre E-Flotte zum Laden kommt oder Ihre elektrische Maschine startet. Wir stellen sicher, dass die Batterieladevorgänge auf Ihren Betrieb abgestimmt sind und integrieren den Speicher selbst nahtlos in Ihre bestehende Infrastruktur. Und der Baukostenzuschuss von 180.000 € / MW für eine zukünftige physische Netzerweiterung bleibt für Sie besser planbar und ohne Überraschungen.

Ihr Kapital bleibt für Ihre Elektrifizierungsprojekte

Ein eigener Batteriespeicher kostet schnell im 7-stelligen Bereich. Im Battery-as-a-Service-Modell tätigen wir diese Investition, bauen und betreiben den Speicher an Ihrem Standort. Sie mieten diesen nur, wenn Sie Ihren Netzanschluss virtuell erweitern wollen, und können sogar parallel mit Lastspitzenkappung oder PV-Eigenverbrauchsoptimierung Ihre Energiekosten senken.

Unsere Lösungen entdecken

How it works

Bnewable's virtual grid expansion at a glance

Full speed ahead on your electrification plans

Whether it's an electric truck fleet or a new electric furnace, your company's electrification is picking up pace, and with it, load peaks in the megawatt range. That would normally require a physical grid upgrade, and the current wait for that permit runs up to 10 years. With Bnewable's battery storage, you expand your grid connection without the wait and start electrifying today.

Extra capacity, exactly when you need it

The battery storage delivers the energy capacity you need exactly when your electric fleet plugs in to charge or your electric equipment starts up. We make sure battery charging cycles are timed to your operations, and we integrate the storage seamlessly into your existing infrastructure.

Explore our solutions

Calculation example

Virtual grid extension with Bnewable's battery storage system

Virtual grid extension example: a day of site demand with and without a batteryLine chart of an industrial site's demand in MW over 24 hours. Including a new production line, site demand peaks at 3.0 MW around 8:00, above the fixed 2.0 MW grid connection limit. The battery bridges 1.0 MW (1,000 kW), so the net grid draw is metered at 2.0 MW. Operational from day one, bridging +1,000 kW for up to 2 years.Site demand (incl. new line)Net grid draw (with battery)Grid connection limitGrid connection limit: 2.0 MW (fixed)3.0 MW peak (incl. new line)Metered|at 2.0 MW+1.0 MW bridged|1,000 kW by the batteryOperational from day one+1,000 kW bridged|for up to 2 years
Peak shaving example: a day of site load with and without a battery Line chart of an industrial site's grid load in MW over 24 hours. Without a battery the load peaks at 3.0 MW around 8:00. With the battery, net grid load is capped at the 2.0 MW grid capacity threshold, shaving 1.0 MW (1,000 kW) off the peak. The battery recharges overnight while load is low. The value of peak shaving is €84,000 a year.

Bnewable does more than virtual grid expansion to maximize the value of your battery storage

A battery sized to bridge your grid connection is only called on during your heaviest hours, the rest of the year it would sit idle. That's why Bnewable puts the same battery to work on more than capacity alone: shaving your demand peaks, optimizing solar self-consumption, and trading on the energy markets. Together, they increase the total financial value of your battery storage.

Two technicians in hard hats inspecting solar panels on an industrial rooftopTwo Bnewable colleagues in a meeting room reviewing energy generation and consumption charts in the Voltana dashboard on a wall-mounted screenA Bnewable energy trader pointing at a live trading dashboard showing day-ahead and intraday market prices while explaining it to a colleague

References

Bnewable's battery storage system virtually expands your grid connection

We experience a daily window of unused grid capacity, combined with high peaks in energy consumption when long queues of visitors start to form. Bnewable helps us optimize our energy consumption in this case by participating in the flexibility market, and supporting Elia in grid balancing.

Unser Batteriespeicher schafft Wert, auch wenn sich Regulatorik ändert

Porträt von Pascal Hartmann, Technischer Projektmanager bei Bnewable

Dr. Max Kronberg

Geschäftsführer Bnewable

Fokus Projektentwicklung und -umsetzung

"Die Netzentgeltstruktur wird gerade grundlegend neu geordnet: Die aktuelle Regelung gilt ab 2029 als nicht mehr EU-konform, weshalb im sogenannten AgNes-Prozess derzeit an einer neuen Netzentgeltverordnung gearbeitet wird. Ob und wie die atypische Netznutzung dabei konkret betroffen sein wird, ist aktuell noch offen.

In dieser Unsicherheit wollen wir Ihnen Sicherheit bieten: Mit Battery-as-a-Service schaffen Unternehmen schon heute finanziellen Mehrwert nach aktueller Regelung - und passen uns flexibel an, wenn sich die Regeln ändern. Weil wir selbst in den Speicher investieren, haben wir das gleiche Interesse wie Sie: eine langfristige Partnerschaft, die mindestens den heutigen Wert absichert und bei regulatorischen Änderungen mitwächst. Ohne eigenes Investitionsrisiko verbauen Sie sich damit keine Entscheidung von morgen."

Battery-as-a-Service

Virtual grid expansion with Bnewable: where do you start?

With the Battery-as-a-Service model, we take care of everything. We install and finance a battery on your site that supports your operations and meets your energy needs.

1

We project your potential savings

We size the battery to your consumption, peak loads, solar generation, and grid connection, then calculate what you'd save before you commit to anything.

2

We invest in the battery, you keep your capital

Bnewable covers the full cost of the system. You provide the space and the grid connection; your capital stays in your core business.

3

We build it, you run your business as usual

Energy storage comes with complex permitting. We handle planning, permits, and installation, while your operations continue as usual.

4

We operate it and absorb all risks for you

We keep the battery running at peak efficiency, cutting demand peaks, maximizing your solar use, or earning market revenue. Maintenance is on us too.

See if my site qualifies

FAQs about
virtual grid expansion

Yes. A flexible connection means the grid operator can limit your capacity at certain moments, and the battery storage system covers your site during those periods so your process keeps running. Bnewable Voltana holds the site inside the limit that applies at the time. Outside those periods, the same battery works on your peaks and on the markets.

Extend your grid connection virtually with Bnewable and start electrifying today

Contact us to explore what virtual grid extension looks like for your business.